DuPont schedule: the 28-day rotation with a week off

Four teams, 12-hour shifts, a cycle of 28 days: four nights on, three off, three days on, one off, three nights on, three off, four days on, then seven days off. Every team works 14 of 28 days and gets a full week off once a cycle. The price is a 72-hour week in the middle. Set the start date below to see your own calendar, or download the template.

Cycle
28 days
Shifts per cycle
14 × 12 h
Average
42 h a week
Longest run
4 days
Longest break
7 days

Calendar: set your start date

Team A starts the cycle on the date you pick. Change the date to match your site, then print it or download the spreadsheet.

D Day shift (7am to 7pm, 12 h)N Night shift (7pm to 7am, 12 h)O Off
Team
Mon
5 Oct
Tue
6
Wed
7
Thu
8
Fri
9
Sat
10
Sun
11
Mon
12
Tue
13
Wed
14
Thu
15
Fri
16
Sat
17
Sun
18
Mon
19
Tue
20
Wed
21
Thu
22
Fri
23
Sat
24
Sun
25
Mon
26
Tue
27
Wed
28
Thu
29
Fri
30
Sat
31
Sun
1 Nov
Team ANNNN···DDD·NNN···DDDD·······
Team B·······NNNN···DDD·NNN···DDDD
Team C···DDDD·······NNNN···DDD·NNN
Team DDDD·NNN···DDDD·······NNNN···
Hours per weekWeek 1Week 2Week 3Week 4
Team A4872480
Team B0487248
Team C4804872
Team D7248048

14 shifts per 28-day cycle, 168 hours, an average of 42 hours a week. Longest stretch worked: 4 days. Longest break: 7 days. Weekend days are shown in blue.

How the DuPont schedule works

  1. Week 1: four night shifts (Monday to Thursday), then Friday to Sunday off. 48 hours.
  2. Week 2: three day shifts (Monday to Wednesday), Thursday off, three night shifts (Friday to Sunday). 72 hours.
  3. Week 3: Monday to Wednesday off, four day shifts (Thursday to Sunday). 48 hours.
  4. Week 4: seven days off.
  5. Teams B, C and D run the same sequence starting one, two and three weeks later, so on any day one team is on days, one on nights and two are off.

What it does well

  • A full seven days off every four weeks, without using holiday.
  • Days and nights alternate, so nobody is on permanent nights.
  • Four teams, no relief team, continuous cover.
  • 182 shifts a year like the other 12-hour patterns, but bundled so that time off comes in useful blocks.

Where it hurts

  • The 72-hour week: six 12-hour shifts in seven days, with a switch from days to nights in the middle of it.
  • In the United States that week is 32 hours of overtime under the FLSA, and the two 48-hour weeks are 8 each: 48 overtime hours per person per cycle.
  • The day-to-night pivot with a single day off between is hard on sleep.
  • Weekends worked are uneven across the cycle; people count them.

Overtime in the United States

The FLSA workweek rule makes the DuPont expensive: the 72-hour week is 32 overtime hours and each 48-hour week is 8, so 48 hours of time and a half per person per 28 days, unless the operation is a hospital or residential care facility on the 8-and-80 system. In states with daily overtime such as California, every 12-hour shift also carries 4 daily overtime hours unless an alternative workweek was adopted by election. Budget the pattern at its overtime cost, not at 42 hours. Numbers for your rates: the overtime calculator; state break rules: break laws by state.

Working Time Regulations in the UK

The 42-hour average is within the 48-hour limit over 17 weeks. The 72-hour week is lawful on its own because the limit is an average, but the 11 hours of daily rest and the 20-minute break on every shift still apply, and the switch from three day shifts to three night shifts with one day off between meets the 11 hours only because the day off is a full 24 hours. Check the weekly rest: 24 hours in each week, or 48 in each fortnight, is met by the three-day and seven-day blocks. The full list of limits: the Working Time Regulations and your rota; leave in hours: the holiday entitlement calculator.

Variants

  • DuPont with 8-hour shifts and six teams, in plants that will not run 12-hour days.
  • A reversed order (days first, then nights) to change which weekends fall in the long week.

Who uses it

Chemical plants, refineries, paper mills, utilities and other continuous-process industries; the pattern is named after the DuPont company where it was introduced.

Other patterns

Frequently asked questions

What is the DuPont schedule?
A 28-day rotation for 24/7 operations: four teams on 12-hour shifts, each team working 4 nights, 3 off, 3 days, 1 off, 3 nights, 3 off, 4 days, 7 off. Every team gets a full week off once per cycle.
How many hours a week is the DuPont schedule?
168 hours per 28-day cycle, an average of 42 a week, made up of a 48-hour week, a 72-hour week, another 48-hour week and a week off.
How much overtime does the DuPont schedule generate in the US?
Under the FLSA weekly rule, 48 hours per person per cycle: 32 in the 72-hour week and 8 in each 48-hour week. Hospitals and care facilities on the 8-and-80 system pay less; states with daily overtime pay more.
Is the DuPont schedule legal in the UK?
Yes. The 42-hour average is under the 48-hour limit, and the pattern gives 11 hours between shifts and a 24-hour weekly rest. Each shift is over 6 hours and needs a 20-minute break.
DuPont or 2-2-3: which is better?
Same average hours and same number of shifts a year. The 2-2-3 spreads them evenly (max 3 in a row, a 3-day weekend every other week); the DuPont bunches them (a 72-hour week) to buy a full week off each month. Teams that value the week off pick DuPont; teams that value steady weeks pick 2-2-3.

Put names on the pattern

The template gives you the teams. The planner gives each person their own shifts on their phone, with breaks and rest checked, and shift change requests that go through the manager instead of a group chat. Free up to 10 people.

Start free